Power Supply To All KWSB Pumping Stations Is Normal, Says KE
Mohammad Ali (@ChaudhryMAli88) Published November 19, 2018 | 12:06 AM
KARACHI, (UrduPoint / Pakistan Point News - 18th Nov, 2018 ) :Power supply to pumping stations of Karachi Water and Sewerage board (KWSB) is normal including Dhabeji.
On Sunday, power supply was affected due to internal fault at Dhabeji pumping station which was rectified by K-Electric teams within a short span of time and power supply was restored, said spokesperson of the power supply Company.
"K-Electric provides all possible support to KWSB and all its strategic installations including Dhabeji and Gharo are exempted from load-shed. To deal with any localized fault, KE teams remain in contact around-the-clock with the Board's representatives for timely resolution", he said.
Recent Stories
Tennis: ATP Barcelona Open results - 1st update
Swiatek's perfect 10 in Stuttgart as Vondrousova stuns Sabalenka
Arandu's roads closed due to flooding
Oil tanker catches fire in Islamabad’s Blue Area
Pakistan committed to ensure safety of foreign nationals: FO
Tennis: WTA Stuttgart results - 1st update
Four passengers injured as train hit an empty vehicle
Over- speeding bus crushed to death two bike riders
Turkey's Freedom Flotilla ready to set sail for Gaza
French teen dies from heart failure after knife attack near school
Iranians appear unfazed by Isfahan blasts
UAF celebrates Int'l Chinese Language Day
More Stories From Pakistan
-
Arandu's roads closed due to flooding
1 hour ago -
Oil tanker catches fire in Islamabad’s Blue Area
1 hour ago -
Pakistan committed to ensure safety of foreign nationals: FO
1 hour ago -
Four passengers injured as train hit an empty vehicle
1 hour ago -
Over- speeding bus crushed to death two bike riders
1 hour ago -
UAF celebrates Int'l Chinese Language Day
2 hours ago
-
Flooding on Chitral-Peshawar Highway strands travelers
2 hours ago -
Bilawal Bhutto demands govt to hold tripartite dialogue to curb terrorism
2 hours ago -
Punjab ombudsman facilitates over 1.36 crore payment to victims
2 hours ago -
Leghari seeks KP Govt’s cooperation in anti-power theft campaign
2 hours ago -
Sehwan Development Authority's staff protests against non-payment of salaries
2 hours ago -
DIG directs SSPs to take unrelenting action against organized crimes
3 hours ago